|
|
|
| Milestone Jobs |
 |
|
- Modernization of high speed DCVV elevator up to 6.3 m/s/(Liaoning TV station, 198m in height).
- Modernization of 4 high speed VVVF elevators, Group control, 38 floors,2.5m/s(Chengdu Greenland Hotel).
- Modernization of 3 high speed elevators with permanent synchronized motor, Group control 2.5m/s, 29floors.(Shanghai Huanyu Building).
- Modernization of high speed VVVF gearless elevator. 2.5m/s, 33 floors(Shanghai Hongqiao City).
- Modernization of high speed DCW elevator, 2.5m/s, 31floors (Shanghai Jieyun Building).
- Modernization of 2 Serial Communication DCW elevators, 2.5m/s, 39floors(Hongkong Waterside Garden).
- Modernization of 3 Group Control elevators, 2m/s 32floors(Macao Women Union Building).
- Modernization of 6 Group Control VVVF elevators, 2m/s, 15floors (Taiwan).
- Modernization of 3 VVVF elevators, 1.75m/s, 25floors (Malaysia).
- Modernization of 6 VVVF elevators, 2.5m/s, 21floors (Malaysia).
- Modernization of 5 VVVF elevators, 1.75m/s, 17floors (London, UK).
- 100 elevator control systems in the Terminal, Goods Area, Parking Lot, etc of Frankfurt Airport, Germany.
- Explosion-proof elevator control system (Berlin,Germany).
- 15t hydraulic elevator control system (Zurich, Switzerland).
- Modernization of 8 VVVF escalators (Beijing Capital Airport).
OEM supplier of several world-famous elevator companies.
|
Shanghai STEP Electric Corporation
© 2008 Shanghai STEP Electric Corporation. All rights reserved. |
|
|
|
|
|